Alignment study and construction documents for approximately 2,400 linear feet of 30-inch diameter water main
Continuous service during construction
The pipeline alignment was contained within the existing road right-of-way
Coordination and meetings with regulatory agencies
Research of current utility drawings
Permitting (utility permit, grading and sediment control, stormwater management waiver, MDE construction permit, etc.)
Test pits and soil borings
Cost estimating
Detailed specification preparation
Thrust restraint design
Design to avoid utility conflicts (gas, overhead and buried electric, water service connections, water service main)
Special construction considerations including working hour restrictions to maintain traffic flow