Oriole Park at Camden Yards Surveys

 

JMT was responsible for all surveying services during the construction of a new major league baseball stadium in downtown Baltimore.  JMT established horizontal and vertical control throughout the site and set up reference lines to re-establish control points destroyed by construction.  Tasks included:

  • Use of Global Positioning Surveys (GPS) to establish reference points
  • Construction stakeout and verification of stadium geometric control
  • Topographic surveys to compute earthwork volume quantities to aid the contractor in determining earthwork volumes. 
  • Utility Surveys
  • Baseline Stakeouts
  • As-Built Surveys

JMT is proud to be a part of the successful team that has made this stadium one of the most popular sports venues in the country.